4

Estimate timelines based on actual time taken in past similar tasks, not on plans

Grade BBig benefitTimeFreeLittle timeNo willpower

Students who estimated they would finish a paper in 33.9 days actually took 55.5 days to complete it; only 29.7% of them met their own estimates. Another group of students was asked to first recall how long similar tasks had taken them in the past before making their estimates. The proportion of students who finished on time rose from 29.3% to 60.0% in this group.

Cost
No cost at all. It only requires a few minutes of review to look up how long similar tasks took previously.
Benefit
Students originally expected to finish their papers in 33.9 days, but the actual time taken was 55.5 days. Only 29.7% of them completed their work by their own estimates. When researchers asked another group of students to first relate past experiences to the current task before estimating, the proportion of students finishing on time rose from 29.3% to 60.0% compared to the control group. This optimism of underestimating timelines no longer appeared in this group.
Notes
Buehler’s study involved only university students in Canada; it was a single study with a small sample size of 37 participants, with roughly 40 participants in each group. Estimating timelines based on historical data from similar projects is known as reference class forecasting; specific engineering applications are described in Flyvbjerg’s work. Halkjelsvik’s review of multiple studies shows that underestimating timelines is more common than overestimating, though the magnitude of the error varies widely depending on the task and research methodology.
Sources · 3
  1. Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the "planning fallacy": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366–381. doi.org/10.1037/0022-3514.67.3.366
  2. Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5–15. doi.org/10.1177/875697280603700302
  3. Halkjelsvik, T., & Jørgensen, M. (2012). From origami to software development: A review of studies on judgment-based predictions of performance time. Psychological Bulletin, 138(2), 238–271. doi.org/10.1037/a0025996

← Read the whole chapter: 4. Don’t waste time

Keyboard shortcuts

Typing any letter opens search, so commands use Option ⌥ + Shift ⇧ + a key (Windows: Alt + Shift + key). / and ? still work on their own.

/ / Ctrl K
Open search
a–z
Type any letter (not a shortcut) to start searching
Esc
Close dialog, menu or sidebar
?
Show these shortcuts
↓ / ↑
Next item
AltShift
Next item
AltShift
Previous item
AltShift
Next chapter / next item on item pages
AltShift
Previous chapter / previous item
AltShift
Mark the current item done
AltShift
Save the current item
AltShift
Listen to the current item
AltShift
Random item
AltShift
Toggle dark mode
AltShift
Show/hide sidebar
AltShift
Open filters
AltShift
Go home
AltShift
Open tools
AltShift
Open self-check
AltShift
Toggle live edit (admin)
AltShift
Bigger / smaller / default text (+)
AltShift
Bigger / smaller / default text (−)
AltShift
Bigger / smaller / default text (0)

Appearance and colors

Sign in

Sign in to carry what you saved, did and read to every device. No password: enter your Gmail, get a 6-digit code or a link, and you are in.